Day 5 - Rock On!

Rock On!

Finally, we can begin adding the gravel.  We used a large size granite so the monstrous Florida thunderstorms don't wash it all away.  It took a lot of bags - my recollection is about 7 bags per step.  It would have been more economical to get half truckload delivered, but it would have been a lot of work to scoop and carry it to the right spot.
Adding gravel to complete bottom steps

As you can see, we did not finish the steps all the way up before starting to add the gravel to the bottom ones because we were excited to see what it would look like.


Comments

Popular posts from this blog

Introduction to Building Steps Up a Slope - Assess, Plan and Calculate

After researching how to build steps up a slope or hill, I was unsatisfied with the lack of detail on instructions or the presentation of information in a step-by-step format with related pictures or videos.  This is my attempt to provide that as we build our own steps to solve a drainage issue. I hope you will learn something from my posts, or at least laugh at my mistakes so that your project will go perfectly smooth. Day 1:  The first related project that we tackled was a terraced drainage wall in the front yard.  We put sod above and a rock garden below, and it seems to be working well so far in holding some of the water coming from the rest of the neighborhood to straight under our rental townhouse. The one bad thing about rock gardens in this area is that leaves will get in there and diminish the effect.  Oh, well.  It would have been too soggy for grass. Picture of 1st terrace in front yard complete: On to step 2 - the side yard where a lot of t...

Day 4 - The Next Steps

The Next Steps To begin the 2nd step, we dug out the area where the side timbers would go to get them roughly placed.  The front timber of the 2nd step is placed right on top of the very back side timbers of the 1st step.  You can see that we are angling our steps so they will curve up the slope.  Use rebar to mount the front of the 2nd step to the 1st step.  To place the rebar, drill a hole where it will go before using a sledge hammer to pound it all the way into the ground.  The sides of the 2nd step are just laying there for placement, and are not yet screwed to the front timber. Rebar pounded into a pre-drilled hole to connect steps Now the treads (side timbers) can be screwed to the front timber of the 2nd step, avoiding the rebar. Screwing the rise to the tread of the 2nd step around the rebar Don't forget to use the sand to get each step level.  Also, landscape fabric at the bottom of each is highly recommended as a weed deterrent. ...